| The
Sardar Sarovar Project comprises, Hydro power Complex having
two power houses - River Bed Power House (6 x 200 MW) and Canal
Head Power House (5 x 50 MW). The status of progress of the
power Houses is as under as on 31/08/2008.
(A)
CANAL HEAD POWER HOUSE (CHPH) 5x50 MW
The CHPH is
a surface power station in a saddle dam on right bank of
the reservoir having total installed capacity of 250 MW
(5 x 50 MW). These five units have been commissioned in
a phased manner during Aug-04 to Dec-04. These units can
be operated with minimum reservoir water level of 110.18
meters. The power produced up to 31/08/2008 is 977.881 MUs.
(B)
RIVER BED POWER HOUSE (RBPH) 6x200 MW
The RBPH is
an under ground power house stationed on the right bank
of the river having six number of Francis type reversible
turbines each of 200 MW installed capacity. The T.G. Sets
are supplied by M/S Sumitomo Corporation, Japan and M/S
BHEL. The 400 KV Switchyard is indoor type having Gas Insulated
Switch Gear and Bus-bars. This six units have been commissioned
in phase manner during Feb-05 to June-06. Total Energy generation
from this power house up to 31/08/2008 is 10311.884 MUs.
The
energy generated in both the power houses is being evacuated
through 400 KV Transmission lines. The energy will be transmitted
to party states i.e. Gujarat, Maharashtra and Madhya Pradesh
in the proportion of 16 : 27 : 57 respectively through 400
KV double circuit transmission lines, namely SSP-Kasor, SSP-Asoj,
SSP-Dhule and SSP-Nagda respectively. All the transmission
lines are commissioned and charged.
|