| RELEVANT
EVENTS PRIOR TO THE CONSTITUTION OF THE TRIBUNAL |
- February,
1961
Administrative approval to Stage-I of the Navagam (Bharuch)
Project accorded by Government of Gujarat.
|
- April,
1961
(1) Inauguration of the Project by the then Prime Minister
(Late Pandit Jawaharlal Nehru and commencement of
preliminary works).
|
- 1963
Investigation of exact site for building High Navagam
Dam.
|
- November,
1963
Agreement (Bhopal Agreement) between M.P. and Gujarat
regarding the height of the Navagam Dam arrived at in a
meeting between the Chief Ministers of both the States and
with the Union Minister of Irrigation and Power (Bhopal
Agreement).
The agreement (Bhopal Agreement) envisaged a Navagam Dam
with FRL 425 ft, with its entire benefits to be enjoyed by
the State of Gujarat, a Punasa Dam (Narmada Sagar), with
FRL 850 ft in M.P. with a cost and benefits sharing
formula, and Bargi project with FRL 1365 ft In Stage-I and
FRL (Full Reservoir Level) 1390 ft In Stage-II to be
constructed with a loan assistance of total Rs. 10.00
crores from the Government of Gujarat and Maharashtra.
|
-
After
considering the representation of the State of Gujarat,
Rajasthan and Madhya Pradesh, the report was submitted to
the Government of India.The unanimous recommendations of
the committee were interalia:
-
Water
availability of 28.94 MAF.
-
Construction
of 12 major dams, namely, Rosra, Basania,Burhner, Bargi,
Chinki, Sitarewa, Barna, Hosangabad, Tawa, Kolar,
Narmadasagar and Omkareshwar (all in Madhya Pradesh) and a
terminal dam at Navagam with height of 500 ft
(3 kilometers from present site).
-
For
Navagam Project, it recommended :
(1) 300 ft canal to irrigate 46 lakh acres (19 lakh
hectares) of land in Gujarat and Rajasthan.
(2) Power generation with installed capacity 1400
Megawatts.
-
The
committee also drew up a Master Plan for full utilisation
of water for irrigation and power benefits integrated
development of Narmada Water Resources.
|
|
|
 |