The
CHPH is a surface power station in a saddle dam on right bank
of the reservoir having total installed capacity of 250 MW
(5 x 50 MW). These five units have been commissioned in a
phased manner during Aug-04 to Dec-04. These units can be
operated with minimum reservoir water level of 110.18 meters.
The energy produced up to 30/06/2008 is 944.939 MUs.
The CHPH is being operated in consultation and as per advice
of NCA/WREB based on irrigation requirement of Gujarat/Rajasthan
and availability of water in reservoir and release from upstream
project of Madhya Pradesh.
The
energy generated from both the power houses is to be evacuated
through 400 KV level through interconnecting transformers
at GIS, situated in RBPH switch yard. The 400 KV Switchyard
is indoor type having Gas Insulated Switch Gear and Bus bars.
The energy is transmitted to party states i.e. Gujarat, Maharashtra
and Madhya Pradesh in the proportion of 16:27:57 respectively
through 400 KV double circuit transmission lines, namely SSP-Kasor,
SSP-Asoj, SSP-Dhule and SSP-Nagda respectively. All the transmission
lines are commissioned and charged.
The operation
and maintenance of SSP power complex and transmission lines
is being done by Gujarat State Electricity Company Limited
(GSECL), for which O&M agreement between SSNNL and GSECL
has been signed.
|